company news

The current page:

Home

/

company news

/

Custom resin trophy making steps and cycles

Custom resin trophy making steps and cycles

Want create site? Find Free WordPress Themes and plugins.

Xin Mattel Trophy manufacturer customizes the trophy process:

1. Open the mold; because the mold is made of silica gel, it is a soft, foldable and reversible product. This allows the leaves and subtle movements that cannot be made with steel molds to be expressed. Even the bark morphology of countless trees can be expressed very delicately; but this mold has a characteristic that it is easy to mold, and silica gel has its fixed use characteristics. When a mold reaches a certain number of production revolutions, the mold must Scrapped; so the product must have many molds when producing large orders. There must also be a special person to open the mold. The process of opening the mold from the slicing, stacking, brushing, and repairing the mold is the first step in determining whether the subsequent product is well produced.
2, molding; is to arrange the mold, grouting in the mold. The pulp here is mainly resin craft and stone powder hardening and other fillers. The Poly Glue is formulated into a fluid with a certain proportion of the filler, and then poured into the mold, and after evacuation, sealing, and demoulding, the product generates a white embryo, which is the prototype of the product.
3, grinding; mainly simple finishing work, mainly to repair the product’s mold line. Some of the back cover is smoothed.
4, repair; mainly to repair those areas that are not perfect.
5, spray color; is painted with a painted pen, according to the color of the sample, this step is mainly the color of the paint.
6, packaging; is to make the products are assembled by means of packaging, packaging is assembly.

Xin Mattel Trophy manufacturer customizes the trophy cycle:
The first step is to design a solution for 5-7 days and provide 3-5 solutions.
The second step, after the program is confirmed, starts to make 3D files for 3-5 days.
The third step, after the 3D file is determined, starts to make samples, which takes about 10-15 days.
In the fourth step, after the sample is confirmed, it takes about 15-20 days to start the production (time according to the quantity).

Did you find apk for android? You can find new Free Android Games and apps.

4月-18-2019

admin

CONTACT US
2/F, Building 1 57-1, Huancheng South Road, Pingdi Street, Longgang District, Shenzhen, Guangdong, China
SERVICE

Shenzhen Xinmeitai Toy Model Design Co., Ltd. All rights reserved.